Groundwater Claims of Beneficial Use: Pump Test Requirements Before Filing

Completing a groundwater project under an Oregon water right permit is only part of the process. Before the right can move toward certification, the permit holder generally must document how the authorized water was actually developed and put to beneficial use. Since April 1, 2026, Oregon has added an important filing requirement for qualifying groundwater Claims of Beneficial Use: required pump-test information must already be on file or submitted with the claim.

A Missing Pump Test Can Stop the Claim Before Review

For groundwater permits subject to the pump-test requirement, OWRD will not accept a Claim of Beneficial Use unless documentation shows that the required pump test or an exemption request has been submitted for each well. The information may be submitted before the claim or at the same time as the claim.

For groundwater permits with priority dates on or after December 20, 1988, the current Claim of Beneficial Use rules specifically require this documentation. If the requirement has not been met, the claim may be returned rather than moving forward for substantive review.

That makes the pump test more than a technical item to address later. It should be part of the certification planning process.

What a Pump Test Tells OWRD About the Well

A pump test provides information about how a well performs when groundwater is withdrawn. Depending on the test, the information can include pumping rate, water levels during pumping, drawdown, and recovery.

Oregon requires pump testing for many wells listed as sources on water right permits, certificates, or registration statements. Domestic wells, stock wells, and other exempt-use wells generally are not subject to the state pump-test program simply because they are exempt wells.

For permitted groundwater development, however, the test helps document the physical performance of the source that supports the water right.

Every Well on the Claim Should Be Reviewed Before Filing

Properties with multiple wells require particular attention. The 2026 filing requirement refers to the pump test or exemption request for each well associated with the groundwater permit.

Before preparing a Claim of Beneficial Use, the permit holder should review:

  • Which wells are authorized under the permit
  • Whether an approved pump test already exists for each well
  • Whether a new test is required
  • Whether a pump-test exemption may apply
  • Whether the well location matches the permit and current mapping
  • Whether measurement and other permit conditions have been completed

OWRD notes that an existing approved pump test may sometimes carry forward to a new right associated with the same well, so a new test is not automatically required in every situation. The existing record should be checked before assuming either way.

Pump Testing Should Be Coordinated With the Beneficial Use Survey

A Claim of Beneficial Use looks at more than well performance. The Certified Water Right Examiner must also document the extent of actual beneficial use and compare it with the permit.

That can involve verifying the place of use, measuring the rate of use, reviewing delivery-system capacity, mapping developed acreage, and confirming compliance with permit conditions.

Reviewing the pump-test record at the same time helps identify missing information before the claim is ready to file. This is especially important when a permit deadline is approaching, because discovering a missing test at the end of the process can create unnecessary complications.

Check the Complete Permit Record Before Certification

A permit holder preparing for certification should not focus on the Claim of Beneficial Use form alone. The well, pump-test record, measurement equipment, authorized acreage, place of use, and permit conditions should all be reviewed together.

Water Rights Pro assists with Claims of Beneficial Use, well flow testing, water-level measurements, mapping, and review of permit conditions. Coordinating these pieces before filing can help produce a more complete record for OWRD review.